1.Goods Description
During walking crawler cranes, the Terex HC275 bottom roller and the track shoe portion will be depressed, gravel sand around the track enters the gap between the track rollers and the track pad, if the crawler track has found large gravel, as far as possible Do not walk and swing operation, and this will have the track shoe and bottom roller by the very serious damage, serious cause fracture of the track shoe supporting wheels and wheel damage.
Lower rollers can cause a lot of damage to the malfunction, such deviation will be walking, running weakness.

2. TEREX AMERICAN crawler crane model:
|
Terex American |
HC50, HC60, HC80, HC110, HC165,HC230, HC275, HC285.etc |
|
Model |
TEREX AMERICAN HC275 |
||
|
MOQ |
1PC |
Payment Terms |
T/T, L/C, Western Union |
|
Material |
40Cr, 50Mn |
Package |
Plywood Pallet or Crate |
|
OEM |
Available |
Delivery Time |
About 15-45 Days |
|
Application |
Crawler Crane |
Technology |
Forging |
|
Loading Port |
Qingdao, Yantai |
Warranty |
1 Year |
3.Delivery
Here are the samples of packing available now. Generally, we pack TEREX AMERICAN HC275 bottom rollers on plywood pallet. Do you have specific request for packing? We could pack as your requirements.

4. FAQ:
a. What is your MOQ of HC27 Bottom Roller ?
We hav’t any quanity limit, you can get much more competitive price if large qty.
b. What’s your lading port ?
Yantai port, Qingdao port, or other China ports.
c. What is your payment term ?
T/T, L/C or Western Union is available here.
d. What is your delivery time ?
The inventory for most common models is enough, it’s 15-20days to product even there are not in stock.
HC275 Bottom Roller is in our hot sales, any inquiry pls send to us.
Hot Tags: hc275 bottom roller, manufacturers, suppliers, dealer, quality, OEM